last time I had do to something similar, I splitted the last move and 
inserted my M code between the two moves.

Worked well.


Le 08/06/2015 08:59, a k a écrit :
> Hi
> i think that instead of look ahead for G0 it will be better to have/create
> new M code (M100 or M(n))  that will:
> after running on G1 mode and after reading code G0 will move Z up 1" (or
> some parameter a=..., then move back on the same last trajectory about 0.5"
> -0.75" or some parameter b=.., then down to initial Z or parameter C=...,
> and reread last 0.5" =0.75" trajectory motion.
> this new M code will open new and necessary capability of linux cnc -- for
> use with welding application.
> How difficult it will be to create such M code?
> Any idea direction how to do that?
>
> thank you
> aram
>
>
>
> On Sun, Jun 7, 2015 at 3:16 PM, a k <[email protected]> wrote:
>
>> hi
>> i am interesting if it will be possible to Linux cnc look ahead 4-5 lines
>> before G0 and then send some signal out?
>> right now i have a working system where when system reads G0 signal going
>> out.
>> now i want to this signal went out like 0.5" - 0.75" of travel before
>> actually system reads G0
>> when i said 0.5" - 0.75"---before G0 machine moves on G1 and when
>> this travel will be around 0.5" - 0.75" before the end of travel i want to
>> signal that indicates G0 go out.
>>
>> thank you
>> aram
>>
> ------------------------------------------------------------------------------
> _______________________________________________
> Emc-users mailing list
> [email protected]
> https://lists.sourceforge.net/lists/listinfo/emc-users


------------------------------------------------------------------------------
_______________________________________________
Emc-users mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/emc-users

Reply via email to