The usual response is that it depends...
More 'light' reading ! To start !
https://www.fcc.gov/sites/default/files/32-KDB-996369-Modules-TCB_Oct_2023.pdf
On Wednesday, April 10, 2024, 5:22:12 PM EDT, Lfresearch
<[email protected]> wrote:
Sorry for the late reply, but I did feel the need to express strong
disagreement with some statements here.
Lets take there first one: how will you know which is worst case if you don’t
test. Seriously? I would answer this by saying that an EMC engineer with any
proficiency can make an educated decision as to what would be the worst case,
further, if one can’t do that you shouldn’t probably be in EMC Engineering. Is
the old saying from school days “ You should have an idea of the answer before
doing the problem “ no longer stressed in school!
The back reference to Boeing is utter BS, sorry Gert, but as someone who
contracts for Boeing I take a very strong exception to that ridiculous
statement. There is absolutely NO correlation between a poor quality
subcontractor and the EMC performance of an EUT. It may be true for airbus, but
leave my Boeing alone please.
Back to the problem at hand, and serious answers only please.
At what point(s) does one draw the line eliminating the need for testing
similar designs.
Thanks in advance,
Derek Walton.
On Apr 6, 2024, at 7:55 AM, Gert Gremmen F4LDP <[email protected]> wrote:
Dear All,
Within the framework of the EMCD, all configurations shall be conform, so if
you choose to actually test,
all configurations shall be part of the test. The subject of worse case is a
"miroir d'alouette"... how will you ever know which
is worst case without carrying out the test ? A pre-scan is informative but
the radiated emission test contains already a pre-scan (peak) for the final
QP-measurement. We already require a EMC risk analysis which is a kind of
pre-scan too. How many pre-pre-prescans will we need to be sure ?
"to repeat some (which?) test to make sure nothing was broken".... it's
another discipline, but that is how Boeing lost a door in flight. And that is
not a unregulated sector without thorough quality scans (understatement), and
still it happens. Imagine the costs and effort for Boeing to rebuild their
reputation ? Didn't we all learned the exponential graph of EMC costs versus
development time ?
If you need proof (for authorities, or for yourself), nothing can replace the
actual test.
Gert Gremmen
On 6-4-2024 0:47, Lfresearch wrote:
Hi folks,
I would like to advise a client at where to draw the line on what needs
testing. I would like to solicit opinions besides my own. Otherwise it’s the
fox urging the chicken coop…
So a manufacturer that makes a product of which there will be several variants.
All use the same board, but have different sections of circuits populated. This
may require slightly different code to run on the same uP in each case.
So.. The burning question is can we perform and analysis that postulates a
worse case hardware/software combination and test just one configuration? Or,
do we have to do every combination?
Or, are there some guidelines about where we draw the line of what to test and
what can be claimed as similarity?
Off list responses are welcome too.
Thanks,
Derek Walton
LFResearch/SSCLabs.
-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
[email protected]
All emc-pstc postings are archived and searchable on the web at:
https://www.mail-archive.com/[email protected]/
Website: https://ewh.ieee.org/soc/pses/
Instructions: https://ewh.ieee.org/soc/pses/list.html (including how to
unsubscribe)
List rules: https://ewh.ieee.org/soc/pses/listrules.html
For help, send mail to the list administrators:
Mike Sherman at: [email protected]
Rick Linford at: [email protected]
For policy questions, send mail to:
Jim Bacher: <[email protected]>
_________________________________________________
To unsubscribe from the EMC-PSTC list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1
--
Independent Expert on CE marking
EMC Consultant
Electrical Safety Consultant
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
[email protected]
All emc-pstc postings are archived and searchable on the web at:
https://www.mail-archive.com/[email protected]/
Website: https://ewh.ieee.org/soc/pses/
Instructions: https://ewh.ieee.org/soc/pses/list.html (including how to
unsubscribe)
List rules: https://ewh.ieee.org/soc/pses/listrules.html
For help, send mail to the list administrators:
Mike Sherman at: [email protected]
Rick Linford at: [email protected]
For policy questions, send mail to:
Jim Bacher at: [email protected]
To unsubscribe from the EMC-PSTC list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
[email protected]
All emc-pstc postings are archived and searchable on the web at:
https://www.mail-archive.com/[email protected]/
Website: https://ewh.ieee.org/soc/pses/
Instructions: https://ewh.ieee.org/soc/pses/list.html (including how to
unsubscribe)
List rules: https://ewh.ieee.org/soc/pses/listrules.html
For help, send mail to the list administrators:
Mike Sherman at: [email protected]
Rick Linford at: [email protected]
For policy questions, send mail to:
Jim Bacher at: [email protected]
To unsubscribe from the EMC-PSTC list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1
-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
[email protected]
All emc-pstc postings are archived and searchable on the web at:
https://www.mail-archive.com/[email protected]/
Website: https://ewh.ieee.org/soc/pses/
Instructions: https://ewh.ieee.org/soc/pses/list.html (including how to
unsubscribe)
List rules: https://ewh.ieee.org/soc/pses/listrules.html
For help, send mail to the list administrators:
Mike Sherman at: [email protected]
Rick Linford at: [email protected]
For policy questions, send mail to:
Jim Bacher: <[email protected]>
_________________________________________________
To unsubscribe from the EMC-PSTC list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1BEGIN:VCARD
FN:Gert Gremmen
N:Gremmen;Gert;;;
ADR:;;1261 Route de Pirot;Chauffailles;;71170;France
EMAIL;PREF=1:[email protected]
TEL;TYPE=cell:+33 7 84507010
NOTE:Independent Expert on CE marking \n Harmonised Standards (HAS-) Consu
ltant @ European Commission for RED\, LVD and EMC\n EMC Consultant\n Elect
rical Safety Consultant\n
X-MOZILLA-HTML:TRUE
END:VCARD