Remarkable difference between 29.9 kHz and 30.1 kHz!

On 2023-07-25 23:39, Ryan Jazz wrote:

Dear Members,

Hope you can help me understand the requirement for the clearance needed between the bottom PCB of power supply to metal chassis.

Looking up UL 62368-1 Third Edition, and using the ‘Voltage up to an including peak’ of _2000 V_ for overvoltage category II Table 10 for _<30 kHz_.

I see the clearance is 1,27 mm.

Going over to Table 11 _>30_ kHz this clearance value jumps to 13,2 mm.

Am I doing this correctly? Or should I be using the ‘working voltage’ of the power supply, Primary to Earthed Dead Metal 392 Vpk, Primary to Secondary 520 Vpk.

100-240 Vac, 100 W, _90 kHz_ switching frequency, AC power supply with a 2x3 inch footprint.

End product is, overvoltage category II, pollution degree 2, material group III.

Indoor audio music processor, Class 1.

All guidance would be appreciated.

If this 13,2 mm value is indeed correct, I may need to use an insulator under the power supply.

Any recommendations for a UL rated insulator type?

Thank you,

Ryan Jazz

Ryan Jayasinghe

Regulatory Compliance Engineer

[email protected]

"After silence, that which best expresses the inexpressible, is music" - Aldous Huxley

LINE6

26580 Agoura Road

Calabasas CA 91302

818.575.3711

line6.com

ampeg.com

------------------------------------------------------------------------

This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to All emc-pstc postings are archived and searchable on the web at:
https://www.mail-archive.com/[email protected]/

Website: https://ewh.ieee.org/soc/pses/
Instructions: https://ewh.ieee.org/soc/pses/list.html (including how to unsubscribe) <https://ewh.ieee.org/soc/pses/list.html>
List rules: https://ewh.ieee.org/soc/pses/listrules.html

For help, send mail to the list administrators:
Mike Sherman at: [email protected]
Rick Linford at: [email protected]

For policy questions, send mail to:
Jim Bacher at: [email protected]

------------------------------------------------------------------------

To unsubscribe from the EMC-PSTC list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1


-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc discussion 
list. To post a message to the list, send your e-mail to <[email protected]>

All emc-pstc postings are archived and searchable on the web at:
https://www.mail-archive.com/[email protected]/

Website:  https://ewh.ieee.org/soc/pses/
Instructions:  https://ewh.ieee.org/soc/pses/list.html (including how to 
unsubscribe)
List rules: https://ewh.ieee.org/soc/pses/listrules.html

For help, send mail to the list administrators:
Mike Sherman at: [email protected]
Rick Linford at: [email protected]

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
_________________________________________________
To unsubscribe from the EMC-PSTC list, click the following link: 
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1

Reply via email to