Hi folks,

I’ve been asked to test a light fixture that has the ability to be daisy 
chained up to 8 units.

When I run conducted emissions, I’m wondering if I need to insist on having 8 
units plugged in at once i.e. fully populated, OR, can I just test one fixture 
at a time since that’s how the system is likely to be used also..

Is there a legal requirement or precedent on how this should be tested as I’m 
going round in circles arguing with myself here.

Thanks,

Derek.

SSCLabs,
Reno, NV.
-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<[email protected]>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Website:  http://www.ieee-pses.org/
Instructions:  http://www.ieee-pses.org/list.html (including how to unsubscribe)
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Mike Cantwell <[email protected]>

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
David Heald: <[email protected]>
_________________________________________________
To unsubscribe from the EMC-PSTC list, click the following link: 
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1

Reply via email to