Scott I’m fairly certain that EN 62368-1:2014 was never listed under the GPSD – only the LVD – 60065 and 60950 remained listed.
The listing of the 2020 version of 62368-1 is accompanied by the following “whereas”: By letter M/452 of 28 September 2009, the Commission made a request to the European Committee for Electrotechnical Standardization (‘Cenelec’) to draw up European standards for personal music players. On the basis of this request, Cenelec adopted standard EN IEC 62368-1:2020 on ‘Audio/video, information and communication technology equipment – Part 1: Safety requirements’ and, further to that, the amendment EN IEC 62368-1:2020/A11:2020. EN IEC 62368-1:2020 is proposed with its amendment A11:2020, which complies with the general safety requirement set out in Directive 2001/95/EC. Its reference should be published in the Official Journal of the European Union replacing the references EN 60065:2002 ‘Audio, video and similar electronic apparatus – Safety requirements’ and EN 60950-1:2006 ‘Information technology equipment – Safety -- Part 1: General requirements’. However, the publication of those references should be limited to the clauses 3.3.19 ‘Sound exposure’ and 10.6 ‘Safeguard against acoustic energy sources’, given that the purpose of Commission Decision 2009/490/EC is limited to ensuring that exposure to sound from personal music players does not pose a risk to hearing. And the listing states Notice: this publication concerns only clauses 3.3.19 “Sound exposure” and 10.6 “Safeguard against acoustic energy sources” of EN IEC 62368-1:2020/A11:2020. Best regards Charlie Charlie Blackham Sulis Consultants Ltd Tel: +44 (0)7946 624317 Web: https://sulisconsultants.com/ Registered in England and Wales, number 05466247 From: Scott Xe <[email protected]> Sent: 01 November 2022 14:45 To: [email protected] Subject: [PSES] EU harmonised standard of EN 62368-1 Ed3 : 2020 for General Product Safety Directive Dear All, On 16 Aug 2022, OJEU listed EN 62368-1 2020 without a deadline of an enforcement date. Normally it will have a transitional period of 18 or 24 months. Does it mean to take effect immediately without a transitional period from EN 62368-1 Ed2 : 2014 to EN 62368-1 Ed 3 : 2020? Thanks and regards, Scott - ---------------------------------------------------------------- This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to <[email protected]<mailto:[email protected]>> All emc-pstc postings are archived and searchable on the web at: http://www.ieee-pses.org/emc-pstc.html Website: http://www.ieee-pses.org/ Instructions: http://www.ieee-pses.org/list.html (including how to unsubscribe)<http://www.ieee-pses.org/list.html> List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Mike Cantwell <[email protected]<mailto:[email protected]>> For policy questions, send mail to: Jim Bacher <[email protected]<mailto:[email protected]>> David Heald <[email protected]<mailto:[email protected]>> ________________________________ To unsubscribe from the EMC-PSTC list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1 - ---------------------------------------------------------------- This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. To post a message to the list, send your e-mail to <[email protected]> All emc-pstc postings are archived and searchable on the web at: http://www.ieee-pses.org/emc-pstc.html Website: http://www.ieee-pses.org/ Instructions: http://www.ieee-pses.org/list.html (including how to unsubscribe) List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Mike Cantwell <[email protected]> For policy questions, send mail to: Jim Bacher: <[email protected]> David Heald: <[email protected]> _________________________________________________ To unsubscribe from the EMC-PSTC list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1

