Hi Mark,Thank you for your response, I will have to revisit using gaskets and 
if there is enough force to have good contact once the door is in place because 
there is no locking feature, since the panels are seated in to slots on the 
frame.The original design does utilize long ground cables, but when multiple 
access panels are opened for maintenance there is no place to lean them and has 
to be disconnected form the system. These door panels are the size of a 
standard door (~3ft x 7ft) and weight around 30lbs.To your point regarding 
safety, there is a concern maintenance or field service may forget to replace 
the ground cable, so we are looking at better methods to address both safety 
and the human factor.
--
Thank you and best regards.
- Frank 

    On Thursday, June 16, 2022, 12:37:55 PM PDT, Stultz, Mark 
<[email protected]> wrote:  
 
 <!--#yiv4157523176 _filtered {} _filtered {} _filtered {} _filtered {} 
_filtered {}#yiv4157523176 #yiv4157523176 p.yiv4157523176MsoNormal, 
#yiv4157523176 li.yiv4157523176MsoNormal, #yiv4157523176 
div.yiv4157523176MsoNormal {margin:0in;font-size:11.0pt;font-family:"Calibri", 
sans-serif;}#yiv4157523176 a:link, #yiv4157523176 
span.yiv4157523176MsoHyperlink 
{color:blue;text-decoration:underline;}#yiv4157523176 
span.yiv4157523176ydpd22a0db0yui3202133055467110346 {}#yiv4157523176 
span.yiv4157523176EmailStyle21 {font-family:"Calibri", 
sans-serif;color:windowtext;}#yiv4157523176 .yiv4157523176MsoChpDefault 
{font-size:10.0pt;} _filtered {}#yiv4157523176 div.yiv4157523176WordSection1 
{}-->
Hi Frank,
 
Can you do a longer ground that allows moving the cover to the side?  In my 
experience it is risky to design a system where the ground is routinely 
disconnected.  If you need to design it that way, I recommend using a braided 
gasket that is partially compressed when the panel is installed.  You’ll need 
the panel and gasket plated so that there is no corrosion that would increase 
the contact resistance since this arrangement can’t be considered gas-tight.
 
  
 
Best regards,
 
  
 
Mark Stultz | CMSE® | Sealed Air | Automated Packaging Systems | Streetsboro, 
OH | 330-342-2402
 
  
 
From: Frank Tang <[email protected]>
Sent: Thursday, 16 June, 2022 3:23 PM
To: [email protected]
Subject: [PSES] Removable door panel grounding
 
  
 
|  | 
You don't often get email 
[email protected] why this is important
  |  |


  
 
 CAUTION: This email originated from outside of the organization. Do not click 
links or open attachments unless you recognize the sender and know the content 
is safe.
 
  
 
Hi All,
 
In the past we have typically done a stud and nut grounding for removable 
lift-off access panels, but this is an inconvenience to disconnect the ground 
cable.
 
What are other methods for grounding large panel doors (3ft x 7ft) if any?
 
  
 
--
Thank you and best regards.
- Frank
 
-
----------------------------------------------------------------
 
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<[email protected]>
 
All emc-pstc postings are archived and searchable on the web at: 
http://www.ieee-pses.org/emc-pstc.html
 
Website: http://www.ieee-pses.org/
Instructions: http://www.ieee-pses.org/list.html (including how to unsubscribe)
List rules: http://www.ieee-pses.org/listrules.html 
 
For help, send mail to the list administrators:
Mike Cantwell <[email protected]> 
 
For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]> 
 
To unsubscribe from the EMC-PSTC list, click the following link: 
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1 
 -
----------------------------------------------------------------

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<[email protected]>

All emc-pstc postings are archived and searchable on the web 
at:http://www.ieee-pses.org/emc-pstc.html

Website: http://www.ieee-pses.org/
Instructions: http://www.ieee-pses.org/list.html (including how to unsubscribe)
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Mike Cantwell <[email protected]>

For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]>

 To unsubscribe from the EMC-PSTC list, click the following link: 
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1 
  

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<[email protected]>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Website:  http://www.ieee-pses.org/
Instructions:  http://www.ieee-pses.org/list.html (including how to unsubscribe)
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Mike Cantwell <[email protected]>

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
David Heald: <[email protected]>
_________________________________________________
To unsubscribe from the EMC-PSTC list, click the following link: 
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1

Reply via email to