Does Elecraft build their own modules or are they contracted out to a 3rd 
party?   

IS keying for CW done with relays or with diodes?

Since serial number 31 was a kit,  is there a second production line for 
assembled units, or do they only have one production line for both kits and 
assembled units?   If they are  working on kits and assembled units on one 
production line then it will be some time to get the first production run 
shipped assuming a production run is 200 units.  

Looking at this as an outsider,  and based on the fact that #31 was just 
received by its owner,  it would seem most of orders in house will not be 
shipped out until sometime next year. 

Toby  W4CAK

 
_______________________________________________
Elecraft mailing list
Post to: Elecraft@mailman.qth.net
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
 http://mailman.qth.net/mailman/listinfo/elecraft    

Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com

Reply via email to