"13.5 seconds key down, twice a minute, or 7.5 seconds four times a minute 
about 47% duty cycle; just to be clear."

If you want to derive duty cycle the time between key down and key up is not 
the right measure.  WSJT-X FT8 mode keys the rig before modulation starts and 
unkeys the rig after modulation stops.

The actual duration of modulation is 12.62 seconds according to my scope 
measurements as compared to the theoretical duration of 12.64 seconds.  Close 
enough to being the same and quite different from 13.5 seconds.

73,
Andy, k3wyc


______________________________________________________________
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:[email protected]

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html
Message delivered to [email protected] 

Reply via email to