Hello,
I read on the french forum that 3.5 is about to be freezed.
Would it be possible to be notified _about a month before _so we may
finish to integrate what we want to be in next major release ?
I have some important code made for a customer that i want to be in 3.5
(about intervention status, see task #909
<https://doliforge.org/tracker/?func=detail&group_id=144&aid=909&atid=247>
on doliforge)...
Is it possible to wait a little before freezing ?
Thanks
Christophe Battarel
--
Responsable technique
SARL altairis
www.altairis.fr
09 52 71 70 96
_______________________________________________
Dolibarr-dev mailing list
Dolibarr-dev@nongnu.org
https://lists.nongnu.org/mailman/listinfo/dolibarr-dev