Lee moon soo created ZEPPELIN-2286: -------------------------------------- Summary: Some test matrix on Travis often exceeds time limits (50min) Key: ZEPPELIN-2286 URL: https://issues.apache.org/jira/browse/ZEPPELIN-2286 Project: Zeppelin Issue Type: Improvement Reporter: Lee moon soo Assignee: Lee moon soo
Currently, we have 9 matrix on travis CI. 2nd,3rd one usually takes around 45min and often exceeds limit. (50min). And as we add more test, test time will increase and we'll more likely see test failing because of time limit. So it's better split test into other test matrix. -- This message was sent by Atlassian JIRA (v6.3.15#6346)