This is a global tracking issue for landing the meta schedule. The RFC can be 
found [here](https://github.com/apache/tvm-rfcs/pull/5). 

## Steps

The steps are numbered following TensorIR (#7527).

### [M3a] Core infrastructure of the PPL

- [ ] Instruction & Trace
- [ ] TracedSchedule
- [ ] Sampler
- [ ] Design space generator
- [ ] Search policy
- [ ] Composite schedule

### [M3b] Host-side search infra

- [ ] Database
- [ ] Cost model
- [ ] Measure callback

### [M3c] RPC-related search infra

- [ ] Measure input, build result, measure result
- [ ] Builder
- [ ] Runner

### [M4a] Implementation of rules

- [ ] Various built-in composite schedules
- [ ] Various built-in mutators
- [ ] Various built-in postprocessors
- [ ] Automatic tensorization

### [M4b] Relay integration


-- 
You are receiving this because you are subscribed to this thread.
Reply to this email directly or view it on GitHub:
https://github.com/apache/tvm/issues/8473

Reply via email to