[Resending this, since I messed up and added the wrong dev@ list initially. Please reply to this email, and not the original post].
Hi all, I’d like to propose that we shift all future releases forward by roughly 2 month. So, the releases would be as following (note that 5.2.0 is on the “legacy” schedule): 5.2.0 — December 2014 5.3.0 — April 2015 (this is an LTS) 6.0.0 — July 2015 6.1.0 — October 2015 6.2.0 — January 2016 6.3.0 — April 2016 (this is an LTS) The rationale for this is basically that a release in November almost never makes sense. No one will deploy anything around Thanksgiving and/or the winter holidays. In addition, I feel these schedule fits better into how we have been scheduling ATS Summits. Thoughts? — Leif