On Fri, Jul 04, 2014 at 10:28:33PM +0200, Krol, Willem van de wrote: > Good evening, > > Attached are two patches. The first is to optimize the leap year > calculation, and the second patch changes the dayofweek algorithm to > fix the handling of a different first day of the week (that is, fday > != 0).
Applied both, thanks!
