Hi all, The branch-4.4 has been cut successfully, and all CIs and release tooling for it are in place. Here is where things stand:
- *branch-4.4: *cut from branch-4.x at bdf99de7402. Post-merge CI is set up and is green so far. - *branch-4.x: *now it points to 4.5.0-SNAPSHOT ( https://github.com/apache/spark/pull/60585), and master has the 4.5 MiMa excludes section (https://github.com/apache/spark/pull/60584). JIRA version 4.5.0 is created. - *Scheduled CI: *branch-4.4 runs the same 8 scheduled builds as branch-4.3 (Maven, Maven Java 21, Java 17/21/25, non-ANSI, Python 3.11 and 3.14), each every three days. To make room, branch-4.1 scheduled CI moves from every three days to weekly ( https://github.com/apache/spark/pull/60595), and the branch-4.4 builds use the cron slots freed by that change. - *Release tooling: *release-util.sh now detects the latest release branch correctly after the cut ( https://github.com/apache/spark/pull/60587). - *JIRA: *the 4.4.0 umbrella is https://issues.apache.org/jira/browse/SPARK-58540, and https://issues.apache.org/jira/browse/SPARK-61845 is the new umbrella for 4.5.0. A few reminders for the QA period (until Dec 6): - Most PRs should now merge to master and branch-4.x. - Please only merge bug fixes, tests, docs and release blockers into branch-4.4. We typically allow a few days of grace period for features that were close to done at the cut, but please mention them on dev@ before merging. - Fix version: use 4.4.0 for changes that are also backported to branch-4.4, and 4.5.0 for changes that land only in branch-4.x. - Release blockers: please set the JIRA Target Version to 4.4.0 and let me know. Best regards, Yicong Huang On Mon, Nov 16, 2026 at 7:29 PM Yicong Huang <[email protected]> wrote: > Hi all, > > A quick status update on Apache Spark 4.4.0: > > *- Branch cut: *branch-4.4 was cut from branch-4.x at bdf99de7402 on Nov > 16 (PT). We are now in the QA period until Dec 6; the first RC is planned > by Dec 7. > - *branch-4.x: *moving to 4.5.0-SNAPSHOT ( > https://github.com/apache/spark/pull/60585, > https://github.com/apache/spark/pull/60584). JIRA version 4.5.0 is > created. > *- CI: *branch-4.4 now has scheduled and post-merge CI matching > branch-4.3. To keep the ASF runner budget in check, branch-4.1 scheduled CI > moves from every three days to weekly ( > https://github.com/apache/spark/pull/60595). > > I'll send another update once the remaining branch-cut follow-ups are done. > > > Best regards, > Yicong Huang >