https://bz.apache.org/bugzilla/show_bug.cgi?id=59227

            Bug ID: 59227
           Summary: Unable to get the cell correct value with Chinese date
                    format
           Product: POI
           Version: unspecified
          Hardware: PC
            Status: NEW
          Severity: normal
          Priority: P2
         Component: HSSF
          Assignee: [email protected]
          Reporter: [email protected]

The cell content is the Chinese date format,but DateUtil.isCelDateFormatted
always think this content is a double not a date

-- 
You are receiving this mail because:
You are the assignee for the bug.

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to