On Sat, Jul 23, 2016 at 08:59:35AM -0700, Ben Pfaff wrote:
> The proposed Open vSwitch release schedule calls for branching 2.6 from
> master on Aug. 1, followed by a period of bug fixes and stabilization,
> with release on Sep. 15.  The proposed release schedule is posted here
> for review:
>         https://patchwork.ozlabs.org/patch/650319/
> 
> I don't yet know of a reason to modify this schedule.
> 
> If you know of reasons to change it, now is an appropriate time to bring
> it up for discussion.  In addition, if you have features planned for 2.6
> that risk hitting master somewhat late for the branch, it is also a good
> time to bring these up for discussion, so that we can plan to backport
> them to the branch early on, or to delay the branch by a few days.
> 
> Thanks,
> 
> Ben.
> _______________________________________________
> dev mailing list
> dev@openvswitch.org
> http://openvswitch.org/mailman/listinfo/dev

I would like to see the rtnetlink patchset included. One of things that needs to
happen before that is taking those decisions about netdev_open and the existence
of conflicting port types with the same name. For example, a system interface
and an interface in the database with the same name but a different type.

I will post some comments on the discussion we already have opened for that.

Just wanted to take the opportunity to mention this expectation of getting those
into 2.6.

Thanks.
Cascardo.