On Sat, Jul 23, 2016 at 08:59:35AM -0700, Ben Pfaff wrote: > The proposed Open vSwitch release schedule calls for branching 2.6 from > master on Aug. 1, followed by a period of bug fixes and stabilization, > with release on Sep. 15. The proposed release schedule is posted here > for review: > https://patchwork.ozlabs.org/patch/650319/ > > I don't yet know of a reason to modify this schedule. > > If you know of reasons to change it, now is an appropriate time to bring > it up for discussion. In addition, if you have features planned for 2.6 > that risk hitting master somewhat late for the branch, it is also a good > time to bring these up for discussion, so that we can plan to backport > them to the branch early on, or to delay the branch by a few days. > > Thanks, > > Ben. > _______________________________________________ > dev mailing list > dev@openvswitch.org > http://openvswitch.org/mailman/listinfo/dev
I would like to see the rtnetlink patchset included. One of things that needs to happen before that is taking those decisions about netdev_open and the existence of conflicting port types with the same name. For example, a system interface and an interface in the database with the same name but a different type. I will post some comments on the discussion we already have opened for that. Just wanted to take the opportunity to mention this expectation of getting those into 2.6. Thanks. Cascardo. _______________________________________________ dev mailing list dev@openvswitch.org http://openvswitch.org/mailman/listinfo/dev