Otherwise, if the test bails out before finishing, the test-netflow daemon doesn't get killed and the test hangs.
Signed-off-by: Ben Pfaff <b...@nicira.com> --- tests/ofproto-dpif.at | 2 +- 1 files changed, 1 insertions(+), 1 deletions(-) diff --git a/tests/ofproto-dpif.at b/tests/ofproto-dpif.at index 3eec947..f007381 100644 --- a/tests/ofproto-dpif.at +++ b/tests/ofproto-dpif.at @@ -1010,7 +1010,7 @@ ovs-vsctl \ --id=@nf create NetFlow targets=\"127.0.0.1:$NETFLOW_PORT\" \ engine_id=1 engine_type=2 active_timeout=10 add-id-to-interface=false -ON_EXIT([kill `test-netflow.pid`]) +ON_EXIT([kill `cat test-netflow.pid`]) AT_CHECK([test-netflow --detach --no-chdir --pidfile $NETFLOW_PORT:127.0.0.1 > netflow.log])AT_CAPTURE_FILE([netflow.log]) AT_CHECK([ovs-appctl time/stop]) -- 1.7.2.5 _______________________________________________ dev mailing list dev@openvswitch.org http://openvswitch.org/mailman/listinfo/dev