[ 
https://issues.apache.org/jira/browse/OFBIZ-7172?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Swapnil Shah updated OFBIZ-7172:
--------------------------------
    Attachment: PRD_1.png
                AM_1.png

> Introduce Material Trace-ability at Inventory Item level on Production Run 
> Declaration and Actual Material screen
> -----------------------------------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-7172
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-7172
>             Project: OFBiz
>          Issue Type: New Feature
>            Reporter: Swapnil Shah
>            Assignee: Divesh Dutta
>         Attachments: AM_1.png, PRD_1.png
>
>
> Currently The projected material requirement over 'Production Run 
> Declaration" screen and "Actual Material" screen don't work in sync.
> It would help if The Inventory level details for projected material 
> requirement based on BoM, start getting reflected over 'Actual Material' 
> screen as well to track inventory against all required material at one place 
> Similar inventory related information could be embedded over Declaration 
> screen under "Material Required by Running Task" section by adding Inventory 
> Item Id column that could show list of all InventoryItemIds against product 
> on click of a button)
> Please refer to attached screenshot for further reference.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to