Swapnil Shah created OFBIZ-7087:
-----------------------------------
Summary: Material/Component requirement is not available for
'Confirmed' Production Runs
Key: OFBIZ-7087
URL: https://issues.apache.org/jira/browse/OFBIZ-7087
Project: OFBiz
Issue Type: Improvement
Components: manufacturing
Reporter: Swapnil Shah
All the material/component requirements are rightly visible as soon as any
production run gets created but once its Confirmed then there is no way to see
the specific material/components that are required for any task from any
tab/screen against the given production run (even its not listed on Actual
Material screen)
To begin with, let's add back the same 'Material' section (as visible for any
Created/Scheduled production runs) just below the production run task section
listing task-wise component requirement along with respective quantity
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)