Issue 19: 2022-10-26
Conference theme: Apache Linkis(incubating) bi-weekly meeting
Meeting time: 2022/10/26 19:30-21:00
Tencent Conference: https://meeting.tencent.com/dm/cE6SdQIoSDEJ
Conference number: 396-220-298
Moderator: Li Meng
issue:
1. [Fixed topic] Apache Linkis incubation & version progress synchronization.
 -- Test Environment Difficulty-VPN IP Change No progress yet
 -- Unit test situation synchronization Bao Yang issue claim 30, pending claim 
50
2. [Fixed topic] Apache Linkis1.3.0 progress synchronization. - Tok Road
 1. The email has been sent to the incubator mailing list, one less binding vote
 2. Tweet preparation
3. [Fixed topic] Apache Linkis 1.3.1 progress synchronization. —— Zhu Hui / Li 
Meng / Tao Zhiqiang
 1. Synchronized progress of multiple data sources, seatunnel and trino engine: 
entering the stage of community environment deployment
 2. Distributed lock optimization
4. [Fixed topic] Apache Linkis 1.3.2 requirements planning. —— Xi Shihao/Li Meng
 1. 1.3.2 Progress Xi Shihao
The development of sparksubmit is completed (temporarily submitted separately 
as a new plug-in method)
 Spark has completed etl development through json, and is submitting PR 
(non-standard places need to be modified), and the data source is configured 
through URL. The 26th regular meeting will determine
 udf is loaded according to id Development is complete, and PR is being 
submitted
 Whether the spark plug-in method can be put in
 2. Linkis thrift protocol implementation
 Thin client approach
5. [Fixed topic] Apache Linkis community operation progress is synchronized. —— 
Li Wen
 Compliance Issues:
 1. The front-end directory name is modified to optimize the dss to the correct 
name
6. [Fixed topic] The host of the next regular meeting, welcome to claim it.
7. [Temporary issue] Support udf management of engine types such as Flink and 
trino. - Wang Heping
8. [Temporary issue] bml supports docking with gitlab for version control. - 
Wang Heping
9. [Temporary issue] Can the linkis-appconn-engineplugin in dss be directly 
migrated to linkis and installed by default for easy integration. —— Xu Ling



第19期:2022-10-26
会议主题:Apache Linkis(incubating) 双周例会
会议时间:2022/10/26 19:30-21:00
腾讯会议:https://meeting.tencent.com/dm/cE6SdQIoSDEJ
会议号:396-220-298
主持人:李孟
议题:
1. 【固定议题】Apache Linkis 孵化&版本 进展同步。
 -- 测试环境 难点-VPN IP变化 暂无进展
 -- 单元测试情况同步 鲍洋 issue 认领30 待认领50
2. 【固定议题】Apache Linkis1.3.0 进展同步。 —— 陶克路
 1.邮件已发 incubator 邮件列表,少一个 binding vote
 2.推文准备
3. 【固定议题】Apache Linkis 1.3.1 进展同步。 —— 朱辉/李孟/陶志强
 1. 多数据源和 seatunnel 、trino引擎进展同步:进入社区环境部署阶段
 2. 分布式锁优化
4. 【固定议题】Apache Linkis 1.3.2 需求规划。 —— 郗世豪/李孟
 1. 1.3.2进展 郗世豪
sparksubmit开发完成(暂时单独提交为新插件方式)
 spark通过json进行etl开发完成,正在提交PR(不规范的地方需要修改),数据源通过URL进行配置26日例会确定
 udf 按照id加载 开发完成,正在提交PR
 spark 插件方式 是否能放进去
 2. Linkis thrift 协议实现
 瘦客户端方式
5. 【固定议题】Apache Linkis 社区运营 进展同步。 —— 李文
 合规问题:
 1. 前端目录命名修改,将dss优化为正确的名字
6. 【固定议题】下一场例会的主持人,欢迎认领。
7. 【临时议题】支持Flink、trino等引擎类型的udf管理。—— 王和平
8. 【临时议题】bml支持对接gitlab进行版本控制。—— 王和平
9. 【临时议题】dss中的linkis-appconn-engineplugin能否直接迁移到linkis中,并默认安装,方便集成。—— 许灵

https://docs.qq.com/doc/DZkFFbHVWc3F2V3N3

MengLi

Reply via email to