[ 
https://issues.apache.org/jira/browse/HIVE-4675?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13707772#comment-13707772
 ] 

Brock Noland commented on HIVE-4675:
------------------------------------

Hi,

Just curious if anyone has started reviewing this yet?  

The reason I ask is HIVE-4815 did a lot of refactoring of this code so that 
patch by itself is quite large.  If no one has started reviewing this then I am 
inclined to merge this patch and HIVE-4815 because the total size of the 
combined patch is actually smaller than the current patch on this JIRA.

TLDR: If I merge this jira with HIVE-4815 the result is a smaller patch.

Brock
                
> Create new parallel unit test environment
> -----------------------------------------
>
>                 Key: HIVE-4675
>                 URL: https://issues.apache.org/jira/browse/HIVE-4675
>             Project: Hive
>          Issue Type: Improvement
>          Components: Testing Infrastructure
>            Reporter: Brock Noland
>            Assignee: Brock Noland
>             Fix For: 0.12.0
>
>         Attachments: HIVE-4675.patch
>
>
> The current ptest tool is great, but it has the following limitations:
> -Requires an NFS filer
> -Unless the NFS filer is dedicated ptests can become IO bound easily
> -Investigating of failures is troublesome because the source directory for 
> the failure is not saved
> -Ignoring or isolated tests is not supported
> -No unit tests for the ptest framework exist
> It'd be great to have a ptest tool that addresses this limitations.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to