Yanquan Lv created FLINK-38156:
----------------------------------

             Summary: Pipeline E2E tests are currently bound to fail.
                 Key: FLINK-38156
                 URL: https://issues.apache.org/jira/browse/FLINK-38156
             Project: Flink
          Issue Type: Improvement
            Reporter: Yanquan Lv


We currently have four Pipeline E2E test stages:

Pipeline E2E Tests (4-Parallelism) / test (8, 1.20.1, pipeline_e2e)

Pipeline E2E Tests (4-Parallelism) / test (8, 1.19.2, pipeline_e2e)

Pipeline E2E Tests (1-Parallelism) / test (8, 1.20.1, pipeline_e2e)

Pipeline E2E Tests (1-Parallelism) / test (8, 1.19.2, pipeline_e2e)

Three of them will definitely fail at the moment:

Pipeline E2E Tests (4-Parallelism) / test (8, 1.20.1, pipeline_e2e)

Pipeline E2E Tests (4-Parallelism) / test (8, 1.19.2, pipeline_e2e)

Pipeline E2E Tests (1-Parallelism) / test (8, 1.20.1, pipeline_e2e)


Refer to:
1. 
[https://github.com/apache/flink-cdc/actions/runs/16563234192/job/46938655789?pr=4065]

2. 
https://github.com/apache/flink-cdc/actions/runs/16363478392/job/46938930574?pr=3968



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to