Hi, devs,

This is the sixth meeting for Flink 2.1 release cycle, also the last sync
meeting before feature freeze. I'd like to share the information synced in
the meeting.


- Feature Freeze

  *IMPORTANT*: Feature Freeze is June 21, 2025, 00:00 CEST (UTC+2), only
two days left, if you want to release your feature in 2.1, please pay
attention to this time!


- Features:

  We ended up with a collection of 15 FLIPs in this release, 8 of which
have been completed and the remaining 7 are in development, all of which
are expected to be completed by feature freeze time

  Release-2.1 main story related features progress:
  1. FLIP-525 AI Model: merged
  2. FLIP-521 Variant Type: confirmed with contributors that it will be
completed before feature freeze.
  3. FLIP-486 Delta Join: confirmed with contributors that it will be
completed before feature freeze.

- CI:

  So far, we have five unstable cases, all of which have created jira
issues:
   1. https://issues.apache.org/jira/browse/FLINK-37701: Aleksandr is
fixing, need to more effort to push fix forward
   2. https://issues.apache.org/jira/browse/FLINK-37703: Still need to
locate the root cause
   3. https://issues.apache.org/jira/browse/FLINK-37892: It's an occasional
occurrence, and we still need Becket to locate the root cause.
   4. https://issues.apache.org/jira/browse/FLINK-37948: Occasionally case,
Zakelly helps to locate the root cause.
   5. https://issues.apache.org/jira/browse/FLINK-37960: Occasionally case,
needs to keep watching the ci build

- Benchmark
  1. https://issues.apache.org/jira/browse/FLINK-37826: No progress

- Sync meeting:

  The next meeting time after feature freeze is 06/25/2025, Please feel
free to join us[2]!


[1] https://cwiki.apache.org/confluence/display/FLINK/2.1+Release
[2] https://meet.google.com/pog-pebb-zrj


Best,
Ron

Reply via email to