Dear devs,
This is the second meeting after feature freeze of Flink 1.20. I'd like to share the information synced in the meeting. -*Cut branch* release-1.20 branch has been cut on Tuesday, and we also updated the version of master branch to 2.0-SNAPSHOT(confirmed with all RMs of 2.0) For PRs that should be presented in 1.20.0, please make sure: * Merge the PR into both master and release-1.20 branches * The JIRA ticket should be closed with the correct fix-versions (1.20.0). -*Cross-team release testing* Release testing is already start and in the meantime, there're still serval flips which need to be confirmed whether cross-team testinig is required[1]. RM had created related tickets includes all the features listed on the 1.20 wiki page[2] as well as other actually completed flips. Also contributors are encouraged to create tickets if there are other ones that need to be cross-team tested (Just create new ticket for testing using title 'Release Testing: Verify ...' without 'Instructions' keyword). Progress of Release Testing(We plan to finish all by the end of next week): - total 13 flip/features, 9 confirmed, 4 wait for response - testing instructions ready: 9 (1 assigned) -*Blockers* Congrats, no known blocker for now. -*Release notes [Highlights]* New features and behavior changes which without the 'Release Note', please help to fill out column in the JIRA(click the Edit button and pull the page to the center), which is important for users and will be part of the release announcement. -*Sync meeting[3]* The next meeting is 07/02/2024 10am (UTC+2) and 4pm (UTC+8), please feel free to join us. Lastly, we encourage attendees to fill out the topics to be discussed at the bottom of 1.20 wiki page[2] a day in advance, to make it easier for everyone to understand the background of the topics, thanks! [1] https://issues.apache.org/jira/browse/FLINK-35602 [2] https://cwiki.apache.org/confluence/display/FLINK/1.20+Release [3] https://meet.google.com/mtj-huez-apu Best, Robert, Rui, Ufuk, Weijie