Paul Lin created FLINK-32143:
--------------------------------

             Summary: Automatic cleanup of terminated flinkdeployments
                 Key: FLINK-32143
                 URL: https://issues.apache.org/jira/browse/FLINK-32143
             Project: Flink
          Issue Type: New Feature
          Components: Kubernetes Operator
            Reporter: Paul Lin


Currently, if a job turns into terminated status (e.g. FINISHED or FAILED), the 
flinkdeployment remains until a manual cleanup is performed.

We could add a configuration named 
`kubernetes.operator.deployment.cleanup.delay`, and clean up terminated 
deployments after the delay. The delay is default to `-1` which means the 
cleanup is disabled.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to