Robert Metzger created FLINK-18366: -------------------------------------- Summary: Track E2E test durations centrally Key: FLINK-18366 URL: https://issues.apache.org/jira/browse/FLINK-18366 Project: Flink Issue Type: Improvement Components: Build System / CI Reporter: Robert Metzger
Every now and then, our E2E tests start timing out (see FLINK-16795), because they hit the currently configured time-limit. To better understand what the expected E2E time, and potential performance regressions, we should track the test execution duration centrally. -- This message was sent by Atlassian Jira (v8.3.4#803005)