Gary Yao created FLINK-10465: -------------------------------- Summary: Jepsen: runit supervised sshd is stopped on tear down Key: FLINK-10465 URL: https://issues.apache.org/jira/browse/FLINK-10465 Project: Flink Issue Type: Bug Components: Tests Affects Versions: 1.7.0, 1.6.2 Reporter: Gary Yao Assignee: Gary Yao Fix For: 1.7.0, 1.6.2
When tearing down the _DB_, we tear down all services supervised by runit. However when running the tests in Docker, sshd is under supervision by runit. When sshd is stopped, the tests cannot be continued because the control node cannot interact with the DB nodes anymore. *How to reproduce* Run command below in control-node container: {code} ./docker/run-tests.sh 1 [...]/flink/flink-1.6.1/flink-1.6.1-bin-hadoop28-scala_2.11.tgz {code} *Expected behavior* sshd should never be stopped -- This message was sent by Atlassian JIRA (v7.6.3#76005)