Till Rohrmann created FLINK-8976:
------------------------------------

             Summary: End-to-end test: Resume with different parallelism
                 Key: FLINK-8976
                 URL: https://issues.apache.org/jira/browse/FLINK-8976
             Project: Flink
          Issue Type: Sub-task
          Components: Tests
    Affects Versions: 1.5.0
            Reporter: Till Rohrmann
            Assignee: Tzu-Li (Gordon) Tai
             Fix For: 1.5.0


Similar to FLINK-8975, we should have an end-to-end test which resumes a job 
with a different parallelism after taking 
a) a savepoint
b) from the last retained checkpoint (this won't work with RocksDB incremental 
checkpoints) 



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to