Hi Ron, I think, Till mentioned in his talk on re-scaling streaming jobs, that a "Savepoint and Stop" command is one of the upcoming features in the "dynamic scaling" thread.
Cheers,
Konstantin
On 12.09.2016 14:39, Ron Crocker wrote:
> I attended Jamie Grier’s excellent presentation at Flink Forward today
> ("Robust Stream Processing with Apache Flink” -
> http://flink-forward.org/kb_sessions/robust-stream-processing-with-apache-flink/
>
> <http://flink-forward.org/kb_sessions/robust-stream-processing-with-apache-flink/>)
> where he showed recovery from a savepoint. It took at least 3 steps - create
> the savepoint, kill the current job, start from savepoint. Is it possible to
> combine these into a single action - not just from the tooling perspective
> (where I think it’s pretty straightforward to simulate what I’m asking for
> here) but to actually have the running job STOP once it processes the save
> point request AND start a new job from that savepoint?
>
> What I’m looking to reduce the gap between the savepoint creation AND the
> stopping of the current task as well as reducing the gap between stopping the
> current job and starting a new job from the savepoint.
>
> Ron
> —
> Ron Crocker
> Principal Engineer & Architect
> ( ( •)) New Relic
> [email protected]
> M: +1 630 363 8835
>
>
--
Konstantin Knauf * [email protected] * +49-174-3413182
TNG Technology Consulting GmbH, Betastr. 13a, 85774 Unterföhring
Geschäftsführer: Henrik Klagges, Christoph Stock, Dr. Robert Dahlke
Sitz: Unterföhring * Amtsgericht München * HRB 135082
signature.asc
Description: OpenPGP digital signature
