That is good to hear that we can so easily solve most of the failing
builds. We should then iterate over the open test-stability issues to see
whether they are still valid after we've merged PR 1915.

On Wed, Apr 27, 2016 at 2:25 PM, Robert Metzger <rmetz...@apache.org> wrote:

> I'm not sure if the issues is as big as it seems on a first sight.
> The reason why all the builds of master are red on travis is that the cache
> of the 5th build is invalid. We have to ask infra to delete the caches and
> then they'll be green again.
>
> On Wed, Apr 27, 2016 at 2:13 PM, Ufuk Celebi <u...@apache.org> wrote:
>
> > Along the lines of what Greg already mentioned, I would like to
> > re-iterate that Travis is often a problem too:
> > - long build times and we are reaching the time limit
> > - unreliable I/O
> > - unreliable resolving of build dependencies
> >
> > @Max: I think you wanted to look into whether we can use Apache's
> > Jenkins server for our builds instead of Travis. Did you ever get
> > around at looking into it? If yes: What's your opinion on replacing
> > Travis with Jenkins? Is it a viable option? Would it improve the
> > Travis-specific problems?
> >
> > On the other hand, the very slow Travis machines also helped
> > discovering some hard-to-catch race conditions.
> >
> > – Ufuk
> >
> >
> > On Wed, Apr 27, 2016 at 2:01 PM, Greg Hogan <c...@greghogan.com> wrote:
> > > We have also started running over Travis' 2 hour limit for the longest
> > build.
> > >
> > > Greg
> > >
> > >
> > >> On Apr 27, 2016, at 7:53 AM, Ufuk Celebi <u...@apache.org> wrote:
> > >>
> > >> Hi Till,
> > >>
> > >> thank you for bringing this up. We really need to fix this.
> > >>
> > >> Filing JIRAs with critical priority was how we tried to solve it in
> > >> the past, but obviously it did not work. There seems to be a mismatch
> > >> between assigned and actual priorities.
> > >>
> > >> As a first step, I would volunteer to gather a list of tests, which
> > >> have failed in the last weeks and make sure that we have JIRAs for
> > >> them.
> > >>
> > >> As a next step, we should coordinate how to resolve those issues
> > >> (maybe prioritized by failure frequency) to get master stable again.
> > >>
> > >> – Ufuk
> > >>
> > >>
> > >>> On Wed, Apr 27, 2016 at 12:12 PM, Till Rohrmann <
> trohrm...@apache.org>
> > wrote:
> > >>> Hi Flink community,
> > >>>
> > >>> I just wanted to raise awareness that in the last 16 days there was
> > just a
> > >>> single Travis build of master which passed all tests. This indicates
> > that
> > >>> we have some serious problems with our test stability or even worse a
> > >>> problem with the master itself. Having an unstable master makes it
> > really
> > >>> hard to assess whether new changes actually broke something or
> whether
> > the
> > >>> failing test was unrelated.
> > >>>
> > >>> We have currently 37 open issues labeled with test-stability and most
> > of
> > >>> them have a critical priority. Therefore, I would propose that we try
> > to
> > >>> tackle them as soon as possible in order to improve our testing
> > stability.
> > >>>
> > >>> Cheers,
> > >>> Till
> >
>

Reply via email to