Hi, > Were the 4.12 and develop branches in sync when the RC was cut? Reasonably sure they were but given the test are running on a timer and not when stuff is checked in it'a hard to say with 100% certainty.
> If they were, the Mustella failure seems to scream "-1" at this RC. Sure it looks like a recent change either the AC stuff or the item renderer stuff has broken something. > A thought: why not follow guidelines for version control and NOT merge > changes from develop into an RC branch? Because: - Changes were made in develop that were needed in the release branch - Only the release branch is tested so for a RC to be tested it must be in sync with develop - Given infrequent releases we need all the fixes :-) - Cherry picking is too much trouble and causes all sort of other issues (eg merging with trunk) Thanks, Justin