Hi,

> Were the 4.12 and develop branches in sync when the RC was cut?
Reasonably sure they were but given the test are running on a timer and not 
when stuff is checked in it'a hard to say with 100% certainty. 

> If they were, the Mustella failure seems to scream "-1" at this RC.
Sure it looks like a recent change either the AC stuff or the item renderer 
stuff has broken something.

> A thought: why not follow guidelines for version control and NOT merge
> changes from develop into an RC branch?
Because:
- Changes were made in develop that were needed in the release branch
- Only the release branch is tested so for a RC to be tested it must be in sync 
with develop
- Given infrequent releases we need all the fixes :-)
- Cherry picking is too much trouble and causes all sort of other issues (eg 
merging with trunk)

Thanks,
Justin