On Fri, Nov 26, 2021 at 12:47 PM Jiang, YuX <yux.ji...@intel.com> wrote: > > You may share some release validation results by replying to this message at > > dev@dpdk.org. > > Update the test status for Intel part. Till now dpdk21.11-rc4 validation test > is almost finished. No critical issue and no new issue is found. > # Basic Intel(R) NIC testing > * Build or compile: > *Build: cover the build test combination with latest GCC/Clang/ICC > version and the popular OS revision such as Ubuntu20.04, Fedora35, RHEL8.4, > etc. > - All test done. > - Known bug: https://bugs.dpdk.org/show_bug.cgi?id=881: > dpdk-next-net-mrvl branch still need rebase the fix. > *Compile: cover the CFLAGES(O0/O1/O2/O3) with popular OS such as > Ubuntu20.04 and RHEL8.4. > - All passed. > * PF(i40e, ixgbe): test scenarios including > RTE_FLOW/TSO/Jumboframe/checksum offload/VLAN/VXLAN, etc. > - All test done. No new issue is found. > - One known bug https://bugs.dpdk.org/show_bug.cgi?id=864: > pmd_stacked_bonded/test_mode_backup_rx:after setup stacked bonded ports,start > top level bond port. > - still verify failed based on dpdk21.11-rc4. > * VF(i40e, ixgbe): test scenarios including > VF-RTE_FLOW/TSO/Jumboframe/checksum offload/VLAN/VXLAN, etc. > - All test done. No new issue is found. > - Two known bugs. Intel dev is investigating them. > [dpdk-21.11]vf_jumboframe/test_vf_jumbo_withjumbo: > launch testpmd failed on driver ixgbe-5.13.4 > [dpdk-21.11]vf_vlan/add_pvid_vf: launch testpmd > showing error log after vf vlan in kernel pf > * PF/VF(ice): test scenarios including Switch features/Package > Management/Flow Director/Advanced Tx/Advanced RSS/ACL/DCF/Share code > update/Flexible Descriptor, etc. > - All test done. No new issue is found. > * Intel NIC single core/NIC performance: test scenarios including > PF/VF single core performance test, RFC2544 Zero packet loss performance > test, etc. > - All test done. No big performance drop. > * Power and IPsec: > * Power: test scenarios including > bi-direction/Telemetry/Empty Poll Lib/Priority Base Frequency, etc. > - All passed. > * IPsec: test scenarios including ipsec/ipsec-gw/ipsec > library basic test - QAT&SW/FIB library, etc. > - Most have done, all passed. > # Basic cryptodev and virtio testing > * Virtio: both function and performance test are covered. Such as > PVP/Virtio_loopback/virtio-user loopback/virtio-net VM2VM perf > testing/VMAWARE ESXI 7.0u3, etc. > - All test done. No new issue is found. > - Known issue: > - One about VMware ESXI 7.0U3: failed to start port. > Intel Dev is under investigating. > * Cryptodev: > *Function test: test scenarios including Cryptodev API > testing/CompressDev ISA-L/QAT/ZLIB PMD Testing/FIPS, etc. > - All test done. No new issue is found. > *Performance test: test scenarios including Thoughput > Performance /Cryptodev Latency, etc. > - All test done. No big performance drop.
Thanks for the report! -- David Marchand