I agree that 6 month seems like a reasonable compromise.

On Tue, Jan 10, 2017 at 10:31 AM, Blake Eggleston <beggles...@apple.com>
wrote:

> I agree that 3.10 should be the last tick-tock release, but I also agree
> with Jon that we shouldn't go back to yearly-ish releases.
>
> 6 months has come up several times now as a good cadence for feature
> releases, and I think it's a good compromise between the competing
> interests of long term support, regular release of features (to prevent
> piling on), and effort to release. So +1 to 6 month releases.
>
> On January 10, 2017 at 10:14:12 AM, Ariel Weisberg (ar...@weisberg.ws)
> wrote:
>
> Hi,
>
> With yearly releases trunk is going to be a mess when it comes time to
> cut a release. Cutting releases is when people start caring whether all
> the things in the release are in a finished state. It's when the state
> of CI finally becomes relevant.
>
> If we wait a year we are going to accumulate a years worth of unfinished
> stuff in a single release. It's more expensive to context switch back
> and then address those issues. If we put out large unstable releases it
> means time until the features in the release are usable is pushed back
> even further since it takes another 6-12 months for the release to
> stabilize. Features introduced at the beginning of the cycle will have
> to wait 18-24 months before anyone can benefit from them.
>
> Is the biggest pain point with tick-tock just the elimination of long
> term support releases? What is the pain point around release frequency?
> Right now people should be using 3.0 unless they need a bleeding edge
> feature from 3.X and those people will have to give up something to get
> something.
>
> Ariel
>
> On Tue, Jan 10, 2017, at 10:29 AM, Jonathan Haddad wrote:
> > I don't see why it has to be one extreme (yearly) or another (monthly).
> > When you had originally proposed Tick Tock, you wrote:
> >
> > "The primary goal is to improve release quality. Our current major “dot
> > zero” releases require another five or six months to make them stable
> > enough for production. This is directly related to how we pile features
> > in
> > for 9 to 12 months and release all at once. The interactions between the
> > new features are complex and not always obvious. 2.1 was no exception,
> > despite DataStax hiring a full tme test engineering team specifically for
> > Apache Cassandra."
> >
> > I agreed with you at the time that the yearly cycle was too long to be
> > adding features before cutting a release, and still do now. Instead of
> > elastic banding all the way back to a process which wasn't working
> > before,
> > why not try somewhere in the middle? A release every 6 months (with
> > monthly bug fixes for a year) gives:
> >
> > 1. long enough time to stabilize (1 year vs 1 month)
> > 2. not so long things sit around untested forever
> > 3. only 2 releases (current and previous) to do bug fix support at any
> > given time.
> >
> > Jon
> >
> > On Tue, Jan 10, 2017 at 6:56 AM Jonathan Ellis <jbel...@gmail.com>
> wrote:
> >
> > > Hi all,
> > >
> > > We’ve had a few threads now about the successes and failures of the
> > > tick-tock release process and what to do to replace it, but they all
> died
> > > out without reaching a robust consensus.
> > >
> > > In those threads we saw several reasonable options proposed, but from
> my
> > > perspective they all operated in a kind of theoretical fantasy land of
> > > testing and development resources. In particular, it takes around a
> > > person-week of effort to verify that a release is ready. That is, going
> > > through all the test suites, inspecting and re-running failing tests
> to see
> > > if there is a product problem or a flaky test.
> > >
> > > (I agree that in a perfect world this wouldn’t be necessary because
> your
> > > test ci is always green, but see my previous framing of the perfect
> world
> > > as a fantasy land. It’s also worth noting that this is a common problem
> > > for large OSS projects, not necessarily something to beat ourselves up
> > > over, but in any case, that's our reality right now.)
> > >
> > > I submit that any process that assumes a monthly release cadence is not
> > > realistic from a resourcing standpoint for this validation. Notably, we
> > > have struggled to marshal this for 3.10 for two months now.
> > >
> > > Therefore, I suggest first that we collectively roll up our sleeves to
> vet
> > > 3.10 as the last tick-tock release. Stick a fork in it, it’s done. No
> > > more tick-tock.
> > >
> > > I further suggest that in place of tick tock we go back to our old
> model of
> > > yearly-ish releases with as-needed bug fix releases on stable branches,
> > > probably bi-monthly. This amortizes the release validation problem
> over a
> > > longer development period. And of course we remain free to ramp back
> up to
> > > the more rapid cadence envisioned by the other proposals if we
> increase our
> > > pool of QA effort or we are able to eliminate flakey tests to the point
> > > that a long validation process becomes unnecessary.
> > >
> > > (While a longer dev period could mean a correspondingly more painful
> test
> > > validation process at the end, my experience is that most of the
> validation
> > > cost is “fixed” in the form of flaky tests and thus does not increase
> > > proportionally to development time.)
> > >
> > > Thoughts?
> > >
> > > --
> > > Jonathan Ellis
> > > co-founder, http://www.datastax.com
> > > @spyced
> > >
>



-- 
Jonathan Ellis
co-founder, http://www.datastax.com
@spyced