Hi all,

I'd like to volunteer to manage the next Beam release, which is 2.62.0.

The branch cut is scheduled for December 25!

That doesn't seem like a great time to cut a release branch. I propose to
cut a week earlier on December 18. This way if anyone does any wild and fun
hacks over the holiday season the release branch will be spared :-)

As usual, please help with the release by:

   - Making sure that any unresolved release blocking issues have their
   "Milestone" marked as "2.62.0 Release" as soon as possible.
   - Reviewing the current release blockers [2] and remove the Milestone if
   they don't meet the criteria at [3]. There are currently 4 release blockers,
   one of which is a flaky test. I inspected and found a number of flaky test
   blockers left on past milestones so I'll do a thorough check of tests
   anyhow.

Let me know if you have any comments/objections/questions.

Thanks,

Kenn

[1]
https://calendar.google.com/calendar/embed?src=0p73sl034k80oob7seouanigd0%40group.calendar.google.com

[2] https://github.com/apache/beam/milestone/26

[3] https://beam.apache.org/contribute/release-blocking/

Reply via email to