Le 26 août 08 à 15:56, Xavier Hanin a écrit :

Hi,

I've been working on the remaining issues targetted to 2.0-RC1, and only a
few are remaining.

We have:
IVY-835 <ivy:install> ant task downloads wrong jars from maven repositories IVY-675 Wrong graph of nodes is logged when circular dependency is detected
IVY-349  Endless recursion in Report
=> those are about to be closed as cannot reproduce if no new activity
happens soon

IVY-652  Ivy constructs incorrect URL if artifact path contains spaces
 => This one Maarten you seem to have already made good progress, any
insight on the remaining time?

IVY-387  Absolute and relative path
IVY-232 Incorrect directory path resolve when running from a different
directory
 => These two are rather old, assigned to you Gilles. Any progress on
these? Do you need help?

IVY-872  Improve performance
=> This one is new and assigned to you Gilles. I don't think this should be a show stopper for 2.0, and can be postponed to 2.0.1 if it takes too
long to implement

So I think we're pretty close to be able to enter in 2.0 release candidates cycles, to finally get 2.0 out! Do you see any other outstanding issue which should get in 2.0? Would you agree with a plan trying to get 2.0 RC1 out before mid september? Then how do you see the release candidates cycles going on? I'd be in favour of trying to keep the cycles short (sg like every 2 weeks), and if no outstanding bug is reported in a cycle, then we release 2.0 final with the same source code as the last RC. What do you think of
this plan?

fine for me !

I have just a little issue that I would like to be addressed before the release. It is about the OSGi version number of the rc and final version. Version numbers in the OSGi environment needs to be ordered alphabetically. Currently the OSGi version of the Ivy bundle is 2.0.0.rc1_$TIMESTAMP. So for the final version, we will have issues to find a name "upper" than that one. I think we should better take 2.0.0.candidate1_$TIMESTAMP (it is still upper than "beta") and then for the final : 2.0.0.final_$TIMESTAMP.

Another point, this one non blocker for the release, but it will be cool if you can also release Ivy into the IvyDE update site simultaneously. Ivy has been re-packaged for the update site with the last release of IvyDE. It would be cool to have it updated to the update without involving a release of IvyDE. So I think that the best way to process is to move the update site build process from the IvyDE build system to the site build system. So the process would be:
- build the release of Ivy
- copy the new jar to /svn/ant/ivy/site/ivyde/updatesite/plugins/ (the entire updatesite will be in svn, jars and .md5) - update manually the site.xml in site/ivyde/updatesite/ so it references the new version - ant generate-ivy-feature optimize-updatesite checksum-updatesite sign-updatesite
- commit the regenerated stuff
After the release is voted:
- there would be a classic site deployment, as the site include the main updatesite - the updatesite mirrors can be updated in updating /www/www.apache.org/dist/ant/ivyde/updatesite on people.apache.org

If no one object I will take care of setting up this, put proper detailed doc about the process in the wiki. Note that this process is not blocker against an Ivy release, we could have some delay between releasing Ivy and having it published into the updatesite. But I have no doubt that some users will quickly ask to have it updated on the Eclipse side :)

Nicolas


---------------------------------------------------------------------