On Wed, 22 Jan 2003, nate wrote: > I had a couple APC units with the SNMP cards, used APC Network shutdown > on the systems, worked pretty well. only downside was tryin to get > java workin on some of the more obscure platforms(AIX 4.3, Solaris 2.5-2.6, > Tru64). On debian and redhat it was a snap though. solaris 7 and 8 was > pretty easy too.
That's the annoying program, it works, but I'd rather not have java and X and all that jazz installed. > > I haven't tried the load estimator. my biggest APC unit was a 2200 with > 2 rackmount battery packs, at about 60% load it gave me approx 2 and > a half hours of runtime. Keep in mind that the rackmount battery packs > count as 2 battery packs, so when configuring the UPS to make it aware > of the battery packs double the amount if its a rackmount(4 batteries > vs 2 in the floor models). Yeah. The battery back I have in the unit now counts as 5 batteries :) 4 batteries approximately the size of car batteries. Mike -- To UNSUBSCRIBE, email to [EMAIL PROTECTED] with a subject of "unsubscribe". Trouble? Contact [EMAIL PROTECTED]