Hi this means uploads need to happen in August, as packages need to be in a week before the point release date. Cheers!
----- Forwarded message from Jonathan Wiltshire <[email protected]> ----- Date: Mon, 29 Jul 2019 14:47:09 +0100 From: Jonathan Wiltshire <[email protected]> To: [email protected] Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected] Subject: Re: Scheduling 10.1 and maybe 9.10 Message-ID: <[email protected]> Ok, we have a winner. Let's make them both 7th September so press aren't under too much pressure. -- Jonathan Wiltshire [email protected] Debian Developer http://people.debian.org/~jmw 4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC 74C3 5394 479D D352 4C51 ----- End forwarded message -----
signature.asc
Description: PGP signature

