Hi, After some trial and error, I found out that if dojo is rebuilt, the tests pass. I don't know what changed in rhino and the upstream changelog for the new version is pretty long with lots of things specific to its API which I'm not familiar with.
Anyway, a no-change rebuild should be enough. (I'll poke people about this tomorrow if no upload is done yet. ) -- Adrien