Hello Steve et al, the call for updated translations was issued this morning with a target date of december 4th.
After that I intend to prepare a NMU for shim-signed closing the l10n
and possibly other low hanging bugs / issues. Please inform me if you
want to do a MU instead (preferred).
Greetings
Helge
--
Dr. Helge Kreutzmann [email protected]
Dipl.-Phys. http://www.helgefjell.de
64bit GNU powered gpg signed mail preferred
Help keep free software "libre": http://www.ffii.de/
signature.asc
Description: Digital signature

