SEZ9 commented on issue #13377: URL: https://github.com/apache/seatunnel/issues/13377#issuecomment-7203634100
@chovy-3012 Yes, your restated checklist matches what was asked, and your reading is correct: this is the go-ahead to open a focused implementation PR, not a merge approval, and the PR still goes through full review. Nothing further is needed on this issue before you open it. What remains is for the PR itself to show: - **Provider and packaging:** `bcprov-jdk18on` 1.87 pinned as the single version and declared in `seatunnel-transforms-v2`, with the resolved transform artifact and its relocation rule. - **Inventory:** every resulting LICENSE/NOTICE/known-dependency entry, checked against the current distribution files. Your earlier estimate that only one line in `release-docs/LICENSE` changes should be demonstrated in the PR rather than carried over as an assumption. - **Runtime proof:** the published vector plus the fixed-IV cases run through the packaged, relocated transform jar on both Zeta and Calcite, asserting the raw bytes and the observable `BYTES` type. - **Edge cases:** malformed input, null, wrong key, and IV layout, with no keys, plaintext, ciphertext, IVs, or derived material in logs. - **Docs:** the EN and ZH pages stating the SM4 `BINARY` contract and the intentional difference from AES's Base64 `STRING` envelope. - **AES:** `AES_ENCRYPT` / `AES_DECRYPT` left unchanged; any later AES migration stays a separate incompatible-change proposal. Please link the PR here once it is open, and review will continue there. <!-- streview-comment:2631 --> -- This is an automated message from the Apache Git Service. To respond to the message, please log on to GitHub and use the URL above to go to the specific comment. To unsubscribe, e-mail: [email protected] For queries about this service, please contact Infrastructure at: [email protected]
