wgzhao commented on PR #13111:
URL: https://github.com/apache/seatunnel/pull/13111#issuecomment-7124522196

   A friendly ping on this one — it has been waiting on a committer review 
since 2026-11-04.
   
   State of head `5b08306819`:
   
   - CI is green on this exact SHA: the apache-side `Build` succeeded, and fork 
run [41749530741](https://github.com/wgzhao/seatunnel/actions/runs/41749530741) 
also passed both `doris-connector-it` legs, including the new 2PC multi-table 
case.
   - @DanielLeens approved this exact head and confirmed the earlier blocking 
failover-cleanup issue is fixed. The two remaining Low items (upgrade-window 
dual abort, CRC32 collision bound) were agreed to go into a single follow-up PR.
   - The branch is `MERGEABLE` with no conflicts, and required checks are not 
strict, so no rebase is necessary unless you prefer one.
   
   @danielnadia @corgy-w — you have both been merging Doris connector changes 
recently. Could one of you take a look, or point me to the right reviewer? I am 
happy to fold the two follow-up items into this PR or answer anything about the 
label-prefix / failover behavior. Thanks!
   


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]

Reply via email to