wgzhao commented on PR #13111: URL: https://github.com/apache/seatunnel/pull/13111#issuecomment-7124522196
A friendly ping on this one — it has been waiting on a committer review since 2026-11-04. State of head `5b08306819`: - CI is green on this exact SHA: the apache-side `Build` succeeded, and fork run [41749530741](https://github.com/wgzhao/seatunnel/actions/runs/41749530741) also passed both `doris-connector-it` legs, including the new 2PC multi-table case. - @DanielLeens approved this exact head and confirmed the earlier blocking failover-cleanup issue is fixed. The two remaining Low items (upgrade-window dual abort, CRC32 collision bound) were agreed to go into a single follow-up PR. - The branch is `MERGEABLE` with no conflicts, and required checks are not strict, so no rebase is necessary unless you prefer one. @danielnadia @corgy-w — you have both been merging Doris connector changes recently. Could one of you take a look, or point me to the right reviewer? I am happy to fold the two follow-up items into this PR or answer anything about the label-prefix / failover behavior. Thanks! -- This is an automated message from the Apache Git Service. To respond to the message, please log on to GitHub and use the URL above to go to the specific comment. To unsubscribe, e-mail: [email protected] For queries about this service, please contact Infrastructure at: [email protected]
