zhangshenghang commented on PR #12381:
URL: https://github.com/apache/seatunnel/pull/12381#issuecomment-5882556938

   Thanks @SEZ9 — let's go with your second option: land the ceiling widening 
as-is and handle F2 and F5 in a follow-up. Both are pre-existing 
characteristics of the test's choreography rather than anything this diff 
introduces, and they're orthogonal to the `atMost` ceiling change, so mixing 
them in here would broaden the PR's scope beyond its one-line purpose. To be 
explicit for the record: the F2 ordering gap (wall-clock awaits letting 
rediscovery land after the `second` append) and the F5 diagnostics gap 
(untilAsserted draining events so the first observation is lost) will be 
tracked and addressed separately — happy to take that work myself unless 
someone beats me to it.
   
   Thanks for the clear framing of both paths.


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]

Reply via email to