Sagar Sumit created HUDI-9212:
---------------------------------

             Summary: MDT Compaction scheduling failure post downgrade
                 Key: HUDI-9212
                 URL: https://issues.apache.org/jira/browse/HUDI-9212
             Project: Apache Hudi
          Issue Type: Bug
            Reporter: Sagar Sumit
             Fix For: 1.0.2


{code:java}
Caused by: java.lang.IllegalArgumentException: Following instants have 
timestamps >= compactionInstant (20250322001638926001) Instants 
:[[20250322001708777__commit__COMPLETED__20250322001719795]] {code}
This is thrown just after downgrading the table back to version 6 and on new 
ingestion, MDT compaction code snippet is triggered and throws this exception 
while trying to schedule compaction in mdt.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to