[ 
https://issues.apache.org/jira/browse/HUDI-8562?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Vinoth Chandar updated HUDI-8562:
---------------------------------
    Reporter: Vinoth Chandar  (was: Y Ethan Guo)

> Move requesting and time generation calls under a single lock step
> ------------------------------------------------------------------
>
>                 Key: HUDI-8562
>                 URL: https://issues.apache.org/jira/browse/HUDI-8562
>             Project: Apache Hudi
>          Issue Type: Improvement
>            Reporter: Vinoth Chandar
>            Assignee: Vinoth Chandar
>            Priority: Blocker
>             Fix For: 1.0.0
>
>   Original Estimate: 6h
>  Remaining Estimate: 6h
>
> For serializability and strict time ordering, we should provide Spanner's 
> TrueTime guarantee, i.e., lock and wait for a time period considering the 
> practical largest clock skew (e.g., 500ms) before generating a new time, so 
> that the time generated is always monotonically increasing for both instant 
> time and completion time.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to