Hi Dwight,

Do you ever trim the genoa so that it is entirely inside the lifelines?

Chuck S

>     On 01/24/2021 7:38 AM dwight veinot via CnC-List <cnc-list@cnc-list.com> 
> wrote:
>      
>      
>     The beam of the Mk I is the same as the beam of my Mk II at 10.5 feet. A 
> high cut clew will help but the sheets will still chafe hard on the life 
> lines under some points of sail. My boat has inboard genoa tracks but there 
> is a limit on how close you can sail to apparent wind angle (point) and still 
> be fast from point A to B upwind. You will be able to sail higher in light 
> air, say below 10kts apparent but as wind speed increases footing off will 
> pay off. The design mainly because of keel and hull shape I believe does not 
> point as well as some newer designs. Besides the lifeline issue you need to 
> consider the shrouds. The Mk I has for and aft lowers with not much distance 
> between the uppers and the toe rail. 
> 
>     On Sat, Jan 23, 2021 at 11:16 PM Bob Mann via CnC-List < 
> cnc-list@cnc-list.com mailto:cnc-list@cnc-list.com > wrote:
> 
>         > >         My '71 C&C 35 mk I does not have any deck tracks.  In my 
> area we used to race with 167% genoa, which I used snatch blocks on the toe 
> rail for.  When I went down to a 155%, I still used the toe rail.  However, 
> the clew comes down just aft of a stantion and gets caught on the lifeline; I 
> already severely bent the port lifeline last year.
> >          
> >         Our OD fleet in Detroit is going to 155% max genoa size in '21 so 
> > I'll be using that sail more often.  All-around, time to add tracks to the 
> > deck.  I've been given these locations for adding track:
> >         Inline tracks
> >         Front 20.0 aft of tack
> >         Back 26.6 aft of tack
> >         Front off center line 3.5
> >         Back off center line  4.1
> > 
> >         Transverse tracks - run from rail to cabin house
> >         130 %  Transverse
> >         19.5 Aft of jib tack
> > 
> >         155% Transverse 
> >         23.1  aft of tack
> >          
> >         I've been successful in Wednesday night races running the 167% to 
> > the toe rail and can continue to do so.  However, for OD races on Saturday 
> > it will be 155% and 130% (which I don't yet own).  
> >          
> >         What do you think of the track locations?  Should the track be 
> > straight, if possible?  What size track, 1.25 T-track?  I'll be going with 
> > Garhauer adjustable sheet leads.  Other thoughts or suggestions?  I have 
> > two months to plan and install as I won't launch until late April.
> >          
> >         Bob Mann
> >         Mystic
> >         Thanks to all of the subscribers that contributed to the list to 
> > help with the costs involved.  If you want to show your support to the list 
> > - use PayPal to send contribution --    https://www.paypal.me/stumurray  
> > Thanks - Stu
> > 
> >     >     --
>     Sent from Gmail Mobile
>     Thanks to all of the subscribers that contributed to the list to help 
> with the costs involved. If you want to show your support to the list - use 
> PayPal to send contribution -- https://www.paypal.me/stumurray Thanks - Stu
> 
Thanks to all of the subscribers that contributed to the list to help with the 
costs involved.  If you want to show your support to the list - use PayPal to 
send contribution --   https://www.paypal.me/stumurray  Thanks - Stu

Reply via email to