Dear ccp4bb, I am in trouble to execute ccp4 jobs on CCP4i with a PC cluster system. Sun Grid Engine, we are using, the job management application running on the Linux cluster, sometimes has troubles to synchronize with CCP4i well.
<operation> 0. Batch job setting is modified to be suitable for our system according to a CCP4i manual. (Configure interface initial parameters : command [qsub -V -cwd]) 1. Submit a job to Sun Grid Engine by selecting the button [batch queue] on a CCP4i GUI. <Normal case> "job status" in the status window subsequently changes [REMOTE](running) -> [FINISHED](finished) <Abnormal case> Even if the submitted job is completed, the status does not change from [REMOTE]. I can confirm if the job is finished or not by opening the output log file of a submitted job. In all cases I previously met the troubles, jobs were finished normally but status never changed till I restarted CCP4i. <Question> 1. I would like to use CCP4i which completely synchronizes with Sun Grid Engine. What should I do? 2. What is a trigger to read/write the status file, which would manage [REMOTE]/[FINISHED] status, into the CCP4i project directory? Sincerely yours, Kunio Hirata -------------------------------- 1-1-1 Kouto Sayo-cho Sayo-gun Hyogo Japan 679-5148 RIKEN/SPrig-8 post doctoral fellow Kunio Hirata e-mail:[EMAIL PROTECTED] --------------------------------