Bauke,

You should always expect full reachability to all subnets unless
specifically told not to.  Sometimes you may need to do redistribution that
is not specifically stated to do that.

On Sun, Jul 5, 2009 at 2:33 PM, Bauke Dzavhale <
[email protected]> wrote:

> Team,
>
>
>
> Having finished LAB 11 - volume 2, went through the ritual of testing my
> end-2-end reachability. I came accross some interesting issues. The PVCs
> between R7 and R8 (task 3-3) are not reachable from anywhere in the network
> (of course except from R7 and R8).
>
>  No redistribution  or routing of these PVCs has been required anywhere in
> the LAB. Did someone else come accross the same situation? Any hints of how
> you guys dealt with the situation?
> My solution was to redistribute the 2 PVCs into OSPF running at R7. Or may
> be this was not required at all...I may well be making a big issue from no
> issue at all...
>
>
> Thanks
>
>
>
> B.
>
> ------------------------------
> Looking for the perfect gift?* Give the gift of 
> Flickr!*<http://www.flickr.com/gift/>




-- 
Regards,

Joe Astorino
CCIE #24347 (R&S)
Sr. Support Engineer – IPexpert, Inc.
URL: http://www.IPexpert.com

Reply via email to