This is osm! Thanks a lot!

2016-11-10 10:22 GMT+01:00 Gavin McDonald <ga...@16degrees.com.au>:
> Hi All,
>
> Yesterday whilst adding some new modes and re-configuring jobs & nodes for 
> removal of some Labels - as notified some weeks ago, I noticed some
> unusual configurations that could affect the overall performance of Jenkins 
> and affect everybody in general.
>
> The changes were wide spread and out of over 2000 builds I would say at least 
> 1500 of them are affected in one way or another.
> To point out, none of this is drastic, and your builds are not affected in 
> terms of software configurations. But a hammer was used here to
> change a lot of builds at once, to make them more uniform.
>
> A few things were changed.
>
> 1. Quite a few builds were reduced to keep a maximum of 5 last builds. This 
> is mainly a space saving effort. (see note below)
>     - this may sound not much but some projects had builds configured to keep 
> 500, 300, 200, 100, 75, 50, 30 builds etc. so it
>       really adds up. I understand that some projects may want to keep builds 
> around longer
>
> 2. Some builds were also changed to keep a maximum of 14 days worth of past 
> builds. Again a space saving effort. As an example some
>     projects were configured to keep 2000, 1000, 800, 500, 200 jobs etc etc ..
>
> 3. Timeout minutes. A fair few builds involved here, some jobs exceeding what 
> *I thought* was sensible were pruned to a maximum of one
>     or two hours here. Some jobs for example were configured for 800, 600, 
> etc minutes. One job was set to timeout after 12000 minutes.
>     I understand that some jobs may break as a result of my changes and 
> obviously that is not the outcome we are aiming for so please
>     do feel free to change your job back to a more sensible setting for your 
> project (And optionally send a mail to builds@ saying you have
>     done so and why).
>
> 4. The same things were done with keep builds with artefacts, reduced to 
> sensible numbers where there were some ‘out there’ configs.
>
> Due to some of these reductions, over 400GB has been saved so far in terms of 
> disk. Stuck jobs should also abort at more sensible
> times too.
>
> I’ll talk about the labels and new nodes in a different email.
>
> Any questions, comments, concerns etc please do feel free to email back to 
> the builds@apache.org <mailto:builds@apache.org> list.
>
> I apologise for the hammer affect, I did not have time to check stats for 
> 2000+ jobs.
> I also apologise for the lack of notice and only notifying after the fact but 
> it needed doing.
>
> Thanks
>
> Gav… (ASF Infra)
>
>

Reply via email to