Hi Radu,

DMRcaller is all green on today's report:

  https://bioconductor.org/checkResults/3.7/bioc-LATEST/DMRcaller/

Remember that after you update (and push to git.bioconductor.org) you
need to wait at least 18h before the update is visible on the build
report. 18h is if you pushed right before the builds start (the software
builds start every day at 4:45 pm EST). If you push right after the
builds start then you will need to wait 42h!

Cheers,
H.

On 04/20/2018 07:47 AM, Radu Zabet wrote:
Hi everyone,

I am the maintainer of DMRcaller. I did an update yesterday and on the
build report today, the package failed with the error.

Error: processing vignette 'DMRcaller.Rnw' failed with diagnostics:
  methylationProfile needs to be a GRangesList
Execution halted


On my machine (MacOS with R 3.4.4) it works

* creating vignettes ... OK

Any suggestion of why this might happen? Is there something I am missing?

Radu



--
Hervé Pagès

Program in Computational Biology
Division of Public Health Sciences
Fred Hutchinson Cancer Research Center
1100 Fairview Ave. N, M1-B514
P.O. Box 19024
Seattle, WA 98109-1024

E-mail: [email protected]
Phone:  (206) 667-5791
Fax:    (206) 667-1319

_______________________________________________
[email protected] mailing list
https://stat.ethz.ch/mailman/listinfo/bioc-devel

Reply via email to