I've got some full backups that take a long time to complete. This
causes bareos to need to cancel the next job so that I don't end up with
a ton of jobs in the queue. However when the next job runs it gets
upgraded to a full because the previous jobs was "failed". Is there a
way to tell bareos that "canceled" is not "failed"?

I have the following in my job defs:
  Reschedule On Error = yes
  Reschedule Interval = 1 minute
  Reschedule Times = 10
  AllowDuplicateJobs = no
  CancelLowerLevelDuplicates = yes
  CancelQueuedDuplicates = yes


-- 
Research Scientist
Raytheon BBN Technologies
5775 Wayzata Blvd, Ste 630
Saint Louis Park, MN, 55416
Office: 952-545-5720

-- 
You received this message because you are subscribed to the Google Groups 
"bareos-users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to